Hot Asphalt Patching
Category:
Pothole/Sinkhole
During the summer months, the asphalt crews from the Maintenance Divisions use Hot Mix Asphalt produced by the Asphalt Plant to patch potholes. On a typical day, each asphalt crew will receive two loads of Hot Mix Asphalt. Each load will weigh between 2-3 tons. Annually, the Maintenance Divisions receive tons of asphalt for Hot Patching.
Updated 1/5/2016 3:48 PM